Correct installation method for the shaft impeller of a double suction pump with middle discharge
Category: Water pump knowledge
2025-08-23
The double-suction split pump, as an efficient and energy-saving fluid conveying device, is widely used in multiple fields such as water conservancy, chemical industry, and electric power. One of its core components—the shaft impeller—must be installed correctly, as this directly affects the pump's performance, stability, and service life. Next, Sanchang Pump Industry will introduce the correct installation method for the shaft impeller of the double-suction split pump, aiming to provide practical operation guidelines for technicians.

1. Preparations Before Installation
Before installing the shaft impeller, first ensure that all parts are intact and perform necessary cleaning and inspection. Specific steps include:
1. Inspect parts: Ensure that key components such as the shaft, impeller, shaft sleeve, and bearings have no cracks, wear, or corrosion, and that all mating surfaces are smooth and clean.
2. Clean parts: Use appropriate solvents to clean the parts, removing grease, dust, and other impurities to keep the surfaces clean.
3. Measurement and verification: Use precision measuring tools to check the straightness of the shaft, the balance of the impeller, and the dimensional tolerances of all mating parts to ensure they meet design requirements.
2. Assembly of the Shaft Impeller
The assembly of the shaft impeller is a key step in the installation process of the double-suction split pump and must be carried out strictly according to the following steps:
1. Install the shaft sleeve: According to the shaft design requirements, install the shaft sleeve on the shaft, ensuring a tight fit between the sleeve and shaft, and fix it using locking devices.
2. Install the bearing: Correctly install the bearing into the bearing housing, paying attention to the bearing's orientation and installation position to ensure free rotation and appropriate axial clearance.
3. Install the impeller: Carefully align the impeller with the shaft end and smoothly push it onto the shaft until the impeller fits tightly against the shaft shoulder. During this process, avoid any collision between the impeller and shaft to prevent damage to the mating surfaces.
4. Adjust the clearance: Use specialized tools to adjust the radial and axial clearances between the impeller and pump casing, ensuring the clearance values meet design requirements. Excessive or insufficient clearance will affect the pump's performance and stability.
5. Lock the impeller: According to the specific design, use locking nuts or keyways to firmly secure the impeller on the shaft to prevent loosening during operation.
3. Precautions for Shaft Impeller Installation
When installing the shaft impeller, pay special attention to the following points to ensure installation quality and pump operation effectiveness:
1. Shaft alignment: During installation, ensure good alignment between the shaft and motor shaft to avoid vibration and noise caused by misalignment.
2. Lubrication and cooling: For bearings requiring lubrication or cooling, ensure the lubrication or cooling system is unobstructed and that lubricants or cooling media are adequately supplied.
3. Balance verification: After installation, perform dynamic balance verification of the shaft impeller to ensure it does not produce excessive vibration at high speeds.
4. Clean installation environment: Keep the installation site clean to prevent foreign objects from entering the pump and affecting normal operation.
5. Follow manufacturer guidelines: Different models of double-suction split pumps may have specific installation requirements. Be sure to carefully read and follow the installation instructions and operation manuals provided by the manufacturer.
4. Post-Installation Inspection and Testing
After installation, a series of inspections and tests must be conducted to ensure the pump's performance and safety:
1. Appearance inspection: Check whether all fasteners are tightened, seals are properly installed, and there are no leaks.
2. Functional testing: Start the pump under no-load conditions, observe whether it runs smoothly and listen for abnormal noises. Gradually load to the design operating conditions, monitoring parameters such as pressure, flow, and power to ensure they meet design requirements.
3. Vibration and temperature monitoring: Use vibration monitors and thermometers to continuously monitor the pump's operating status, promptly detecting and addressing any abnormalities.
4. Long-term operation observation: After the pump is put into formal operation, regularly inspect and maintain it, record operating data, evaluate performance changes, and provide a basis for subsequent maintenance.
In summary, the correct installation of the shaft impeller in a double-suction split pump is the foundation for ensuring efficient and stable pump operation. Through detailed preparation, standardized installation procedures, strict precautions, and comprehensive inspection and testing, pump performance can be effectively improved, service life extended, and reliable support provided for various industrial applications.
RELATED INFORMATION
2025/08/22
2025/08/21
Recommend Products
Contact Us
Free Hotline:0086-13307481676
Fixed telephone:0086-13307481676
Mobile:0086-13307481676(WeChat)
E-mail:sales@sanchangpump.com