Installation and disassembly procedures for multi-stage pumps in the petrochemical industry

2025-08-07

The installation and removal of multi-stage pumps in the petrochemical industry require professional knowledge and experience to ensure that each step is performed accurately to guarantee the normal operation of the equipment and personnel safety.

I. Multi-stage Pump Installation Steps

1. Preliminary Preparation: Before installing the multi-stage pump, ensure a clean working environment and prepare the necessary tools and safety equipment. Also, confirm the compatibility of the multi-stage pump with the system.

2. Foundation Check: Check if the installation foundation is stable and level to ensure the pump is securely installed.

3. Installation in Place: Place the multi-stage pump on the foundation, adjust the pump's position to match the pipes, power supply, etc.

4. Alignment Adjustment: Ensure the pump shaft is aligned with the drive equipment (such as the motor) to avoid misalignment.

5. Foundation Bolting: Secure the multi-stage pump to the foundation using foundation bolts, ensuring no looseness.

6. Pipeline Connection: Connect the inlet pipe, outlet pipe, and other related pipelines according to the process, ensuring good sealing.

7. Sealing and Lubrication: Install the bearing seals, ensure sealing effectiveness, and add lubricating oil as required.

8. Electrical Connection: Connect the motor to the power supply, ensuring that the motor's rotation direction is consistent with the pump's rotation direction.

9. Inspection and Debugging: After completion of installation, conduct a thorough inspection, then perform a test run to ensure everything is normal.

II. Multi-stage Pump Removal Steps

1. Preliminary Preparation: Turn off the relevant power supply to the multi-stage pump and ensure a safe working environment.

2. Cleaning Work: Clean the surface of the pump and the surrounding environment to ensure a clean work area.

3. Removal of Electrical Connections: First remove the electrical connections of the motor.

4. Removal of Bearings and Seals: Remove the bearings, bearing seals, and other components in order.

5. Removal of Pipelines: Remove the inlet pipe, outlet pipe, and other related pipelines in order.

6. Separation of Pump Body: Gently separate the pump body from other main components.

7. Inspection and Evaluation: Inspect the removed components and evaluate their condition.

8. Cleaning and Maintenance: Clean each component and perform necessary maintenance.

9. Storage and Record Keeping: Store the components properly and record relevant information to prepare for future installation or maintenance.